Approvals Documentation

The following provides relevant documentation available for review.

 

Cooljarloo Mine - Falcon Extension

Tiwest propose to mine an extension of the existing mineral reserves located in the north western extremity of the Cooljarloo Mining Lease. This is a minor extension of approximately one year in duration for the dry mining component of the operation. Works are planned to commence during the latter half of 2008.

The Falcon Extension is being assessed in accordance with Section 38 of the Environmental Protection Act 1986 at the level of an Environmental Protection Statement (EPS). Details regarding the process and outcomes of the EPA's assessment can be obtained from the Environmental Protection Authority's website. The EPS and related attachments are available for download below:

Cooljarloo Falcon Extension Environmental Protection Statement

Surface and Ground Water
Attachment 1: Surface and Groundwater Investigation
Attachment 2: Modelling of Groundwater Drawdown
Attachment 3: Revised Drawdown Modelling
Attachment 4: Vegetation Mortality Risk Assessment

Flora and Vegetation
Attachment 5: 2006 Flora, Vegetation and Phytophthora Cinnamomi Assessment
Attachment 6: Local and Regional Conservation Significance Assessment
Attachment 7: Survey for Schoenus Species of Conservation Significance

Fauna
Attachment 8: Fauna Values of Tiwest's Falcon Lease
Additional notes on invertebrates

Soils and Soil Landscapes
Attachment 9: The Soils and Soil Landscapes of Falcon
Attachment 10: Acid Sulfate Soil Risk Investigation

Noise
Attachment 11: North Mine Operations Acoustic Assessment and Modelling

Other
Attachment 12: DEH EPBC Database Check
Attachment 13: DEH EPBC Assessment Findings
Attachment 14: DIA Database Check Report for Falcon Tenement
Attachment 15: Collated Comments from Government Agencies and Tiwest Responses

Management Plans and Procedures
Attachment 16: Corporate Environment Standards
Attachment 17: Community Perception Survey
Attachment 18: DRAFT Groundwater Drawdown Management Plan
Attachment 19: DRAFT Rehabilitation Management Plan
Attachment 20: Cooljarloo Dust Management Plan
Attachment 21: Vegetation Clearing Procedure (and associated forms C00728 and C0772)
Attachment 22: Dieback Management Plan and Procedures
Attachment 23: Hydrocarbon Management Procedure
Attachment 24: Geological Pit Control Procedure
Attachment 25: Waste Management Plan
Attachment 26: Rehabilitation Performance: Extract from the Tiwest Annual Environmental Report 2007

 
Return to the Home Page